Finding · as stated by the study, recorded by Coridum · status verified-machine

Finding F-0610

“Due to insufficient ventilation, the radon concentra tion was 15,000–19,000 Bq/m3, and up to 25,000 Bq/m3 near the overflow weir, at process flow rates of 350–750 m3/h.”

Tyrväinen Radon transport to indoor air in groundwater plants as a by-effect of different water treatments (2023). Page 7. CKB 0452

Structure

Factor
Radon
Population
waterworks staff
Setting
groundwater treatment plant (process hall), FI
Study design
measurement of radon release from water into indoor air at Finnish groundwater treatment plants: radon in water before and after each process unit and radon in the indoor air of pump rooms and process halls (class 4)
Effect
other 15,000
Caveat
workplace air at a groundwater plant with insufficient ventilation; the sentence gives a range, its two ends are recorded as two rows and the local peak sits in extra

A Finding records what one published document states, verbatim and with its page. It is not a conclusion of Coridum; see the Claims that build on it.